ERIKA, DINTA SARI (2021) EVALUASI FASILITAS POKOK SISI DARATAN PADA PELABUHAN PENYEBRANGAN BAJOE KABUPATEN BONE PROVINSI SULAWESI SELATAN. Diploma thesis, Politeknik Transportasi Sungai, Danau , Dan Penyeberangan Palembang..
Text
12 ABSTRACT ERIKA.pdf Download (226kB) |
|
Text
ERIKA BAB 1 SUDAH REVISI.pdf Download (382kB) |
|
Text
ERIKA BAB 2 SUDAH REVISI.pdf Download (524kB) |
|
Text
ERIKA BAB 3 SUDAH REVISI.pdf Download (762kB) |
|
Text
ERIKA BAB 4 SUDAH REVISI (1).pdf Download (2MB) |
|
Text
ERIKA BAB 5 SUDAH REVISI.pdf Download (1MB) |
|
Text
ERIKA BAB 6 BARU.pdf Download (260kB) |
|
Text
01 HALAMAN SAMPUL FIX LIRI.pdf Download (162kB) |
Abstract
The Bajoe Ferry Port is organized by the South Sulawesi Provincial Transport Department which is also managed by the Bajoe Ferry Port and supervised by the Bajoe Ferry Port Service Unit, Land Transportation Management Center XIX Region of South Sulawesi and West Sulawesi. In addition, PT. ASDP Indonesia Ferry (Persero), as the ship operator, provides ferry boats which serve the Bajoe - Kolaka commercial route. These ferry boats have ferries trajectories of 4.7 nautical miles with a travel time of 8 hours. Nevertheless, the Bajoe Ferry Port still has inadequate land facilities and non-optimal facilities operation. Based on the results of the analysis, it revealed that the Bajoe Ferry Port had inadequate passenger waiting room facility. It had not separated the loading dock parking lot and deliver / pick-up parking lot. Furthermore, the Bajoe Ferry Port also did not operate the weighbridge facility and even it had no a portal on it. Consequently, it is necessary to evaluate and add facilities to improve the existing services at the Bajoe Ferry Port. Firstly, procuring the passenger waiting room facility and adding some supporting facilities for their comfort in the waiting room. Secondly, planning the parking lot and optimizing the use of weighbridge facility in order to improve both onboard and at the port services, to expedite the flow of entry to the port, and to accelerate the loading and unloading process. Finally, disciplining security at the port aimed at passengers and vehicles through the available facilities during the service users are at the Bajoe Ferry Port. Keywords: the passenger waiting room facility, the parking lot facility, the weighbridge facility.
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | ?? HE ?? |
Depositing User: | Admin |
Date Deposited: | 03 Aug 2021 06:28 |
Last Modified: | 03 Aug 2021 06:28 |
URI: | http://repository.poltektranssdp-palembang.ac.id/id/eprint/44 |
Actions (login required)
View Item |